Bucharest, 26th, Ion Garbea Street
Project ready Sep. 2011
COTROCENI RESIDENTIAL project consists of two buildings, to be erected on the plot of 6,367.72mē.
The BAR Building is a GF+10Fl+TechFl building, whilst the TOWER Building is a GF+15Fl+2TechFl building. Two general basements are developed under both of the buildings.
The program is mainly residential (90%), and also featuring other functions like offices, services and small commercial, as well as technical dependencies.
ARHI GRUP scope:
Concept design
Architectural design
Structural design
Electro-mechanical design
Design phases:
Feasibility study
Concept design
Building permit documents
Construction documents
Tender documents
Detailed design
1 | 2 | ||||||||||||
3 | 4 | 5 | |||||||||||
6 | 7 | ||||||||||||